Getting an Engineering Permit

There are three different Engineering Permits a contractor can pull:  

  • Right-of-Way
  • Right-of-Way / Site Work and 
  • SWPP permits.  

This section will focus on applying for the Right-of-Way Permit, as the other two permits are written up by the Engineering Project Coordinator, in conjunction with Predevelopment and Development projects.

Right-of-Way Defined:


Applying for a Right-of-Way Permit:

Contractors can apply for a Right-of-Way Permit in the following ways: 

The permit can be paid for over the phone or online, and is afterward issued through AdobeSign for electronic signature.


Required Documents:


The Process:

Flow of Permit


Additional Documentation: